Parameter teknikal melakukan peralatan pirolisis | |||||
Item | Kandungan | ||||
1 | Jenis Peralatan | DY-1-6 | DY-1-8 | DY-1-10 | DY-1-12 |
2 | Bahan mentah | Tayar/plastik | Tayar/plastik | Tayar/plastik | Tayar/plastik |
3 | Kapasiti 24 jam | 6 tan | 8 tan | 10 tan | 12ton |
4 | Marerial Reaktor | Q245R | Q245R | Q245R | Q245R |
5 | Ketebalan reaktor | 14mm | 14mm | 16mm | 16mm |
6 | Jumlah kuasa | 17KW | 17KW | 25KW | 25KW |
7 | Kawasan penyejukan kondensor | 40sqm | 40sqm | 65sqm | 65sqm |
8 | Bunyi db (a) | ≤85 | ≤85 | ≤85 | ≤85 |
9 | Saiz reaktor (d × l) | 2200 × 6000 | 2200 × 6600 | 2600 × 6600 | 2800 × 6600 |
10 | Masa penghantaran | 20days | 20days | 20days | 20days |
11 | Berat | 26T | 28T | 30T | 32T |
Tidak | Item | Kos setiap batch |
1 | 10 tan tayar sisa | 10T × 800RMB/T = 8,000RMB |
2 | 0.4 tan arang batu | 0.4T × 800RMB/T = 320RMB |
3 | Air dan elektrik | 200 × 1.00RMB = 200RMB |
4 | Pekerja | 4 × 100RMB = 400RMB |
5 | Jumlah kos | 8,920RMB |
Tidak. | Item | Pendapatan |
1 | Minyak mentah | 10T × 90%× 4.500RMB = 40,500MB |
2 | Karbon Hitam | 10T × 10%× 520RMB = 520RMB |
3 | Keuntungan kasar | 41,020RMB |
4 | Keuntungan bersih harian | 41,020RMB-8,920RMB = 32,100RMB |
5 | Keuntungan bersih bulanan | 32,100RMB × 25 = 802,500RMB |
6 | Keuntungan bersih tahunan | 802,500RMB × 10 = 8,025,000RMB |