Profesional·Perkhidmatan Sehenti
Dapatkan penyelesaian tersuai dan sebut harga yang menguntungkan di sini: 8613526692320

| Parameter teknikal DOING Pyrolysis Equipment | |||||
| barang | Kandungan | ||||
| 1 | Jenis peralatan | DY-1-6 | DY-1-8 | DY-1-10 | DY-1-12 |
| 2 | Bahan mentah | tayar/Plastik | tayar/Plastik | tayar/Plastik | tayar/Plastik |
| 3 | Kapasiti 24 jam | 6 tan | 8 tan | 10 tan | 12ton |
| 4 | Maririal of Reactor | Q245R | Q245R | Q245R | Q245R |
| 5 | Ketebalan Reaktor | 14mm | 14mm | 16mm | 16mm |
| 6 | Jumlah kuasa | 17KW | 17KW | 25KW | 25KW |
| 7 | Kawasan penyejukan pemeluwap | 40sqm | 40sqm | 65sqm | 65sqm |
| 8 | Bunyi dB(A) | ≤85 | ≤85 | ≤85 | ≤85 |
| 9 | Saiz Reaktor(D×L) | 2200×6000 | 2200×6600 | 2600×6600 | 2800×6600 |
| 10 | Masa penghantaran | 20days | 20days | 20days | 20days |
| 11 | Berat badan | 26T | 28T | 30T | 32T |
| Tidak. | item | Kos Per Batch |
| 1 | 10 tan sisa tayar | 10T×800RMB/T=8,000RMB |
| 2 | 0.4 tan arang batu | 0.4T×800RMB/T=320RMB |
| 3 | Air dan elektrik | 200×1.00RMB=200RMB |
| 4 | Pekerja | 4×100RMB=400RMB |
| 5 | Jumlah Kos | 8,920RMB |
| TIDAK. | item | pendapatan |
| 1 | Minyak Mentah | 10T×90%×4,500RMB=40,500RMB |
| 2 | Karbon Hitam | 10T×10%×520RMB=520RMB |
| 3 | Keuntungan Kasar | 41,020RMB |
| 4 | Keuntungan Bersih Harian | 41,020RMB-8,920RMB=32,100RMB |
| 5 | Keuntungan Bersih Bulanan | 32,100RMB×25=802,500RMB |
| 6 | Keuntungan Bersih Tahunan | 802,500RMB×10=8,025,000RMB |
hubungi kami
HUBUNGI KAMI